< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=2845724332249608&ev=PageView&noscript=1"/>
Frequently Ascending problems of 10 Magazine Electric Power.cicso sfp transceivers module wholesale
You are here: Home » Blog » Fiber optic equipment factory » Frequently Ascending problems of 10 Magazine Electric Power.cicso sfp transceivers module wholesale

Frequently Ascending problems of 10 Magazine Electric Power.cicso sfp transceivers module wholesale

Views: 0     Author: Site Editor     Publish Time: 2023-04-10      Origin: Site

whatsapp sharing button
linkedin sharing button
line sharing button
facebook sharing button
sharethis sharing button

1 (5)

1. Although the permanent light module is applicable, it is often likely to harm the duration of the control module. Therefore, it is not recommended to frequently insert it.

2. The 10 -dimensional light module cannot be connected to the five types of network cables together, because the five types of network cables do not compat with 10 兆 transmission.

The power of the 3,000 -Dibin light module is 1.5W, and the heat value is high. If the network switch has several SFP+sockets, it is not recommended to apply the 10D light module.

4. Three -Rine light module cannot be applied on the Gigabit switch, but the SFP+control module of the 10,000 -Dibi power port can interconnect with the Gigabit network card electric port SFP control module. Multi -speed response -兆 兆 modules must be selected.

Because the links of network security devices such as big data centers network switches are between 10 meters to 100 meters, in most cases, the big data centers are all in the inside. The transmission spacing of the cable is within 7m, and the transmission spacing is too short, and although the digital power mount cable can reach the transmission spacing regulations, the cost fee in the 100M transmission is too high. At this time, the 10G electric port control module just fills the lack of the spacing spacing of the fast cable and the vacancies of the cost of the digital exercise cable within 100M.

In the 30 -meter link, the 10D light module is more cost -effective compared to the 10D light module. If the original comprehensive wiring system uses copper cables, it can repeatedly use the previous five types of twisted line wiring resources for 10GE Internet deployment, so applying a 10D light module is the best choice; Walking with optical cables will increase the cost of deployment costs. ETU-Link (ETU-LINK) can be supplied to colorful port control modules with a variety of types of electric port, including the Gigabit network card power port control module. The 10D optical module and its response power port control module.

Leave a Message
Customer Message

QUICK LINKS

PRODUCTS CATEGORY

SOLUTIONS

Tel/WhatsApp

+86-755-89582791 / +86-13823553725

Copyright  2024 Shenzhen HS Fiber Communication Equipment CO., LTD. All rights reserved. Sitemap | Privacy Policy | Vulnerability Management Policy | Supported By leadong.com